|
 |
WP2 - User requirements and evaluation
|
|
Objectives
The objectives of this
workpackage are:
- to capture the requirements of the end-users
(mobile learners) of the system;
- to survey the latest research in mobile
learning area; and
- to define evaluation criteria and to evaluate
the project results, even from a pedagogical perspective, with respect
to the previously captured requirements and also to the objectives of
the project.
Description of work
Requirements workshops and pair-wise partner meetings
will be held to extract the requirements of the system, for the three
task areas to be used in the trials. This will involve meetings with end-users
within the partner sites (i.e. researchers, students, education departments
etc) as well as with the content-provider departments. A literature search
will be conducted to identify suitable metrics for assessing cognitive
load, with a view to setting a general requirement to minimise that load.
This may involve looking at the methods, algorithms and practices people
use to perform their tasks, and the resources associated with cognitive
scaffolding available in the environment. This work will feed into WP
4 and WP 11.
A survey of the latest research in this area will be made and published
as an interim report. EU Mobile Newsletter will be used in as a source
for getting updated state of the art.
Evaluation criteria, methodologies and templates will be made covering
system usability, functionality and performance. These will enable a comprehensive
evaluation to be performed by all partners, according to ISO 13407 (Human-Centred
Design Processes for Interactive Systems), and by real users in WP11.
Usability will be measured as part of a usability test, inspired by European
Usability Support Centres [EUSC]. Robust metrics for measuring the effectiveness,
efficiency and satisfaction have been developed by the ESPRIT MUSiC project
[MUSIC]. Satisfaction will be measured by a questionnaire such as SUMI.
The Common Industry Format [CIF] for usability test reports can be used
to report usability metrics. Partner 6 leads this WP.
Deliverables
- PM4: D2.1 Initial user requirements
- PM4: D2.2 Evaluation methodology and criteria
- PM10: D2.3 Evaluation of Pre-prototype
- PM16: D2.4 Evaluation of first prototype
- PM22: D2.5 Final user requirements
- PM22: D2.6 Evaluation of second prototype
Milestones and expected result
The expected results from this work package
are:
- a clear, defined set of user requirements
to use a basis to design and evaluate the solution developed in the
project; and
- comprehensive evaluation criteria that
will be used in WP8 to influence prototypes.
BSCW link: http://bscw.uni-koblenz.de/bscw/bscw.cgi/0/82382
Back
to Project objectives
|